AUTOMOTIVE
Foundry Plant in an Automotive Plant
Assembly of a heat treatment plant for press hardening of chassis parts
Location
Bursa/ Turkey
Scope
Mechanical and electrical assembly of a
heat treatment plant
- Bringing in and unpacking
- Mechanical assembly
- Electrical Installation
- Positioning, alignment
Duration
4 weeks
Challenges
Limited space for bringing in.
New plant parts must be lifted over existing
plant without causing any damage.
Manufacturing line for gear box cases
Location
Tianjin / China
Scope
Mechanical and electrical installation, of a interlinking loading/unloading system for a manufacturing line
- Assembling of the conveyors at the end customer plant
- Assemble and installation of the gantry system
- Installation of the movable robots on the gantry system
- Installation and leveling of the conveyor system
- Electrical and pneumatic installation of the whole system
- Start up support
Duration
5 month with interruptions between
Challenges
Installation in several steps
Installation during production
Four-point Cutting Press
Tyre Plant
Location
Camacari / BRAZIL
Scope
Mechanical assembly and electrical installation of a calender line for a tyre plant
- Bringing in
- Mechanical assembly
- Precision leveling
- Electrical installation
- Piping
- Commissioning assistance
Duration
7 Months
Challenges
Shortage in availability of special tools and equipment in the local market required high flexibility in work preparation